Merry Christmas & Happy 2027! Less downtime. More good times. Celebrating 13 years of sorlavit.com
Skip to content
Sorlavit KimIT Support, Network & Infrastructure Services Let’s talk

Articles are written in English. The Thai translation button opens Google Translate; code and commands stay in their original form.

PLC / Backups, Changes & Commissioning

Investigate a PLC running old logic after a power interruption

Some platforms distinguish the currently running application from the stored boot application used at restart.

Compiled for Sorlavit Kim · Published · Updated · 1 min read

Environment and inputs: Industrial PLC / automation guidance · Verify the exact controller, module, firmware, engineering tool and machine documentation. Linked vendor examples apply to their stated products and library versions; observation, state changes and physical work require distinct authorization.

Observe and record

Compare approved application identifiers, deployment records and the target's documented boot-storage behavior without cycling power as a test.

What the results mean

An online change or download does not universally update every boot image. Exact persistence and startup rules depend on the target and tool settings.

Fix the cause and check again

Have the controls owner reconcile the supported boot application with the validated running revision, then verify through an authorized isolated or scheduled recovery test.

Protect the machine and its data

Do not power-cycle a live machine or overwrite boot storage before confirming the intended source and data recovery plan.

Share this article

Back to all articles