Merry Christmas & Happy 2027! Less downtime. More good times. Celebrating 13 years of sorlavit.com
Skip to content
Sorlavit KimIT Support, Network & Infrastructure Services Let’s talk

Articles are written in English. The Thai translation button opens Google Translate; code and commands stay in their original form.

Oracle Database / Operations & Incident Response

Diagnose a Scheduler job running at the wrong local time

A calendar schedule can be correct for one timezone and unexpected after a daylight-saving transition or session change. Inspect the stored schedule and timestamps.

Compiled for Sorlavit Kim · Published · Updated · 1 min read

Environment and inputs: Oracle Database 19c baseline · SQL*Plus-compatible SQL unless RMAN, DGMGRL, ADRCI or a host shell is specified. Check release, patch level, edition and container first.

Start with this diagnostic

Run each example in the tool named in the guide: SQL, RMAN, DGMGRL or the host command shell. Replace example names with approved values. To query DBA and V$ views, use authorized catalog access in the correct database container. Do not add broad permissions just to run an example.

SELECT owner, job_name, start_date, repeat_interval, next_run_date FROM dba_scheduler_jobs WHERE owner = 'APP_OWNER' AND job_name = 'APP_NIGHTLY_JOB';

What the results mean

Timestamp-with-time-zone values and the repeat expression describe schedule intent. Compare them with the business timezone rather than only the server's displayed clock.

Fix the cause and check again

Review timezone-region use and the documented calendaring semantics. Test the proposed schedule across daylight-saving boundaries before an approved change.

Before you make a change

Do not manually change the server clock or shift the database timezone to repair one job's schedule.

Share this article

Back to all articles