Oracle Database / Operations & Incident Response
Diagnose a Scheduler job running at the wrong local time
A calendar schedule can be correct for one timezone and unexpected after a daylight-saving transition or session change. Inspect the stored schedule and timestamps.
Environment and inputs: Oracle Database 19c baseline · SQL*Plus-compatible SQL unless RMAN, DGMGRL, ADRCI or a host shell is specified. Check release, patch level, edition and container first.
Start with this diagnostic
Run each example in the tool named in the guide: SQL, RMAN, DGMGRL or the host command shell. Replace example names with approved values. To query DBA and V$ views, use authorized catalog access in the correct database container. Do not add broad permissions just to run an example.
SELECT owner, job_name, start_date, repeat_interval, next_run_date FROM dba_scheduler_jobs WHERE owner = 'APP_OWNER' AND job_name = 'APP_NIGHTLY_JOB';
What the results mean
Timestamp-with-time-zone values and the repeat expression describe schedule intent. Compare them with the business timezone rather than only the server's displayed clock.
Fix the cause and check again
Review timezone-region use and the documented calendaring semantics. Test the proposed schedule across daylight-saving boundaries before an approved change.
Before you make a change
Do not manually change the server clock or shift the database timezone to repair one job's schedule.