Merry Christmas & Happy 2027! Less downtime. More good times. Celebrating 13 years of sorlavit.com
Skip to content
Sorlavit KimIT Support, Network & Infrastructure Services Let’s talk

Articles are written in English. The Thai translation button opens Google Translate; code and commands stay in their original form.

Network & Infrastructure / High Availability & Recovery Design

Failback data direction after disaster-recovery activation

A recovered primary site is restarted after the secondary has accepted new writes. Resuming the old replication direction can overwrite the current authoritative state.

Compiled for Sorlavit Kim · Published · Updated · 1 min read

Environment and inputs: Routed and clustered services; define failure ownership, fencing and application recovery requirements before testing. Diagnostic/design example; not tested on production equipment.

What to check first

Record current write ownership, replication positions, application consistency and the intended failback procedure. Treat the recovered site's older data as evidence, not automatically as the preferred source.

What the results mean

Site preference and data authority are different decisions. Once recovery operations accept writes elsewhere, the original primary may no longer contain the newest valid history.

Plan the fix

Follow the application's supported resynchronization and ownership-transfer workflow, including backup or preservation of both states where required. Prevent writes on the returning side until authority is established.

Check the result and know how to undo the change

Verify transaction markers and one write owner before moving clients back. Abort failback if histories diverge beyond the supported reconciliation method or the proposed direction would discard committed work.

Share this article

Back to all articles