Data Monitoring / Power BI Refresh & Data Reliability
Power BI: Refresh schedule collisions
Several semantic models contend for the gateway at the same minute. Overlay refresh start and finish times with gateway load and shared source demand.
Environment and inputs: Power BI Desktop and Power BI service; gateway, connector, capacity and license capabilities depend on the deployed configuration.
Failure scenario
Several semantic models contend for the gateway at the same minute. Confirm the cause before choosing a fix.
What to check first
Overlay refresh start and finish times with gateway load and shared source demand. Record the time, affected scope and a time period when the system was working normally.
Fix the confirmed cause
Stagger independent schedules and verify that the business freshness deadline still holds. Write the expected result first. Change one relevant setting at a time.
Check the result and share your findings
Repeat the check for refresh schedule collisions using the same scope and a typical operating period. Check that the original problem is resolved, the expected records are present, and systems that use the result still receive correct data.
If the change loses needed data, produces wrong results or increases delay, restore the saved settings through the agreed recovery process.
Limits and precautions
Use read-only access where possible. Limit queries to the time period or data you need. Test changes in an approved environment; this example has not been tested on your systems. Do not include passwords, access tokens or sensitive records in shared results.